Structural Consultant for the 66 MWe Self-Generation Project on Nutrien Rocanville Potash mine.
Design of reinforcement to existing 1500 m long piperack to support additional loads
Reinforcement of roof for supporting new duct work. Dynamic analysis of foundation for Solar 40000 lbs 5.6MW gas turbine.
Structural Engineer for demolition of existing boiler and replacement with new 80000lb/hr boiler. Dynamic analysis for FD fan foundation. Analysis for roof retrofitting.
Boiler foundation for their manufacturing plant in Toronto.
Design of HRSG and duct supporting structures.
Descon Technical Services
Copyright © 2010 Descon Technical Services - All Rights Reserved.